Design and construction of a single span prestressed concrete beam bridge founded on driven steel piles and concrete abutments. Work performed by Stahly included survey, design, bidding, and construction administration. Stahly also assisted with a TSEP Emergency Grant to help defray the cost of the project.
28,000
$313.9K
2019
The existing bridge was closed in October 2018 after an underwater inspection performed by MDT found a significant scour hole beneath the center pier. Stahly assisted the County with the installation of a detour bridge to be used for local traffic during design and construction of the new bridge. Due to early high water, the detour bridge had to be removed at the end of March, and the contractor had to proceed without a work bridge. Also, due to inclement weather, the contractor was awarded 27 weather days, which delayed the project significantly. Pipe piles on the end bents were prebored due to hard material.
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Helena, MT Office
3530 Centennial Drive
Helena, MT 59601
Billings, MT Office
2223 Montana Ave, Suite 201
Billings, MT 59101
Bozeman, MT Office
851 Bridger Drive, Suite 1
Bozeman, MT 59715
Great Falls, MT Office
219 2nd Ave S, Suite 302
Great Falls, MT 59405
Cody, WY Office
1001 12th Street
Cody, WY 82414
We're hiring! Click to see available positions