Stahly Engineering is contracted to construct a new elementary school in the City of Townsend. The original building was constructed in 1952 and had issues such as leaks, water damage, heating issues, and rooms that were not ADA compliant. The school district was in need of a replacement building to better suit the learning environment of the students.
The new two-story building is being built on the existing elementary school playground, with constraints because of the existing school continuing to be occupied during construction. The project consists of a 52,860 SF new elementary school, 2,480 SF band room connector, 1,420 SF library connector, and a 17,070 SF middle school interior remodel.
73,830 sqft.
$18.8m
In Progress
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Navigation
Helena Office
3530 Centennial Drive
Helena, MT 59601
(406) 442-8594
Regional Manager:
Robie Culver
Bozeman Office
851 Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-8594
Regional Manager:
Zach Lowe, P.E.
Billings Office
2223 Montana Ave, Suite 201
Billings, MT 59101
(406) 601-4055
Regional Manager:
Dax Simek, P.E.
We're hiring! Click to see available positions