Stahly Engineering removed and replaced the damaged culvert and made repairs to the adjacent roadway. The existing culvert was damaged due to flooding. The project required coordination with adjacent landowners to provide Toole County with the best alternatives for the project. Stahly Engineering provided engineering services for the planning, design, permits, bidding, inspection, and construction administration for the project.
N/A
$27K
2019
Stahly Engineering conducted a topographical survey that encompassed the existing roadway and stream channel to develop an accurate base map for plan and quantity development. The survey team collected all the marked utilities and other site information necessary to minimize any possible construction conflicts. The project required a Montana Joint Application for Montana’s Streams, Wetlands, Floodplains and Other Bodies of Water to acquire several permits in order to complete the scope of work.
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Navigation
Helena Office
Bozeman Office
Billings Office
We're hiring! Click to see available positions