Plevna Water Storage & Distribution Systems

Overview

The Town of Plevna completed a two-phase water storage and distribution system replacement in 2015. In 2014, Stahly Engineering designed and provided construction administration services for Phase 1 which included the installation of a 204,000-gallon water storage tank, construction of a new pump house with pressure boosting system, replacement of 8,600 lineal feet of water main, and new service connections. Phase 2 completed the replacement of the remaining water mains and services in town with an additional 12,000 LF of mains replaced.

Project Size

20.600 LF

Project Value

$3.3m

Year Completed

2015

Details

Stahly Engineering performed survey, engineering design, and construction administration and inspection. The construction cost of the project was $3.3 million. The scope of work also included full0time onsite inspection.

Got a project in mind?

Drop us a line today and tell us about it. Our friendly staff is standing by to answer your questions and get your project across the finish line.

We're hiring! Click to see available positions