We're hiring! Click to see available positions
The Town of Plevna completed a two-phase water storage and distribution system replacement in 2015. In 2014, Stahly Engineering designed and provided construction administration services for Phase 1 which included the installation of a 204,000-gallon water storage tank, construction of a new pump house with pressure boosting system, replacement of 8,600 lineal feet of water main, and new service connections. Phase 2 completed the replacement of the remaining water mains and services in town with an additional 12,000 LF of mains replaced.
20.600 LF
$3.3m
2015
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Helena, MT Office
3530 Centennial Drive
Helena, MT 59601
Billings, MT Office
2223 Montana Ave, Suite 201
Billings, MT 59101
Bozeman, MT Office
851 Bridger Drive, Suite 1
Bozeman, MT 59715
Great Falls, MT Office
219 2nd Ave S, Suite 302
Great Falls, MT 59405
Cody, WY Office
1001 12th Street
Cody, WY 82414
We're hiring! Click to see available positions