The Town of Plevna completed a two-phase water storage and distribution system replacement in 2015. In 2014, Stahly Engineering designed and provided construction administration services for Phase 1 which included the installation of a 204,000-gallon water storage tank, construction of a new pump house with pressure boosting system, replacement of 8,600 lineal feet of water main, and new service connections. Phase 2 completed the replacement of the remaining water mains and services in town with an additional 12,000 LF of mains replaced.
20.600 LF
$3.3m
2015