The Town of Plevna completed a two-phase water storage and distribution system replacement in 2015. In 2014, Stahly Engineering designed and provided construction administration services for Phase 1 which included the installation of a 204,000-gallon water storage tank, construction of a new pump house with pressure boosting system, replacement of 8,600 lineal feet of water main, and new service connections. Phase 2 completed the replacement of the remaining water mains and services in town with an additional 12,000 LF of mains replaced.
20.600 LF
$3.3m
2015
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Navigation
Helena Office
3530 Centennial Drive
Helena, MT 59601
(406) 442-8594
Office manager:
Robie Culver
Bozeman Office
851 Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-8594
Office manager:
Theron Thompson, P.E.
Billings Office
2223 Montana Ave, Suite 201
Billings, MT 59101
(406) 601-4055
Office manager:
Dax Simek, P.E.