Overview

The Front Street Interceptor Sanitary Sewer project involved the replacement of approximately 6,200 lineal feet of 12 and 14-inch diameter sewer mains with new 18, 21, and 24-inch diameter mains. The project is part of the City of Bozeman 2015 Wastewater Collection Facilities Plan Update.

Project Size

6200 lineal feet

Project Value

$2.18m

Year Completed

2019

Details

Stahly Engineering was under contract with Bozeman Health to conduct design and permitting services in order to allow for construction of the upgrades. Completion of the project prior to Fall of 2019 was required to accommodate expansion of the Bozeman Health campus on Highland Boulevard. The project requires permitting through several agencies in addition to MDEQ due to the alignment passing through wetlands, railroad right-of-way, and MDT right-of-way. Extensive public outreach is a key component to success of the project as the sewer mains are located within narrow corridors in close proximity to residences and businesses in one of the oldest areas of Bozeman.

Got a project in mind?

Drop us a line today and tell us about it. Our friendly staff is standing by to answer your questions and get your project across the finish line.

We're hiring! Click to see available positions