The Front Street Interceptor Sanitary Sewer project involved the replacement of approximately 6,200 lineal feet of 12 and 14-inch diameter sewer mains with new 18, 21, and 24-inch diameter mains. The project is part of the City of Bozeman 2015 Wastewater Collection Facilities Plan Update.
6200 lineal feet
$2.18m
2019
Stahly Engineering was under contract with Bozeman Health to conduct design and permitting services in order to allow for construction of the upgrades. Completion of the project prior to Fall of 2019 was required to accommodate expansion of the Bozeman Health campus on Highland Boulevard. The project requires permitting through several agencies in addition to MDEQ due to the alignment passing through wetlands, railroad right-of-way, and MDT right-of-way. Extensive public outreach is a key component to success of the project as the sewer mains are located within narrow corridors in close proximity to residences and businesses in one of the oldest areas of Bozeman.
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Helena, MT Office
3530 Centennial Drive
Helena, MT 59601
Billings, MT Office
2223 Montana Ave, Suite 201
Billings, MT 59101
Bozeman, MT Office
851 Bridger Drive, Suite 1
Bozeman, MT 59715
Great Falls, MT Office
219 2nd Ave S, Suite 302
Great Falls, MT 59405
Cody, WY Office
1001 12th Street
Cody, WY 82414
We're hiring! Click to see available positions