We're Hiring! Explore Our Careers Page to Discover Your Next Opportunity!
Stahly Engineering completed survey and site civil design for the new Capitol Tribal Flag Plaza. The Stahly team collaborated extensively with A&E Design to present several different options for this highly visible project. Design elements to consider included ADA ramps, flags, railings, planners, and more. This process required creativity and communication among all members. The project required continuous inspections because of the complexity of retaining walls, soils, and compaction.
A topographic survey of approximately 150 feet by 150 feet between the Thomas Francis Meagher statue and the north side of the State Capitol Building was conducted. Professional services included the design and development of a plans package for the addition of a flag plaza, including a colored concrete grid and (10) 30-foot aluminum flag poles.
N/A
$69K
2021
Design elements include:
The project was designed in accordance with City of Helena Design Standards and Montana Public Works Standard Specifications.
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
HELENA, MT OFFICE
BILLINGS, MT OFFICE
BOZEMAN, MT OFFICE
GREAT FALLS, MT OFFICE
CODY, WY OFFICE
1001 12th Street
Cody, WY 82414
(307) 509-5541
Regional Manager:
Justin Lundvall, P.E.
We're hiring! Click to see available positions