The existing bridge at the location was a timber bridge founded on timber piles, with timber abutments. The existing bridge was two spans, which was replaced with a single span prestressed concrete beam superstructure founded on driven steel piles and concrete abutments.
N/A
$228K
2017
Stahly Engineering assisted Fergus County in securing TSEP funds for the replacement of the bridge. Additional services provided by Stahly Engineering include:
This bridge is located over Big Spring Creek, and is in a detailed flood study area, meaning the water surface of the creek could not be increased at all. In addition, lengthening the bridge to accommodate hydraulics was a challenge due to the proximity to the highway on the east, and a residential driveway on the west.
Stahly Engineering is available to help you plan and execute your next project involving engineering, survey, or grant services.
Helena, MT Office
3530 Centennial Drive
Helena, MT 59601
Billings, MT Office
2223 Montana Ave, Suite 201
Billings, MT 59101
Bozeman, MT Office
851 Bridger Drive, Suite 1
Bozeman, MT 59715
Great Falls, MT Office
219 2nd Ave S, Suite 302
Great Falls, MT 59405
Cody, WY Office
1001 12th Street
Cody, WY 82414
We're hiring! Click to see available positions